Packaging & Manufacturing Consulting
Efficiency Capability, Productivity

Item cp185 - Building, Pelletizing

Asset ID
cp185
Manufacturer
Model
Built
2007
Location
Winnebago, MN
Video Links
N/A

Product Description

Metal building and structure housing all Feeco peletizing system and 5 silos. Bulilding consists of 3 parts - and 2 levels. Part 1: building with all the equipment except the additives and electrical is 45 ft wide and 60 ft long. It is 48 ft at the peak 42 ft sides. Part 2: The electrical and tank lean-to building is 32 x 20 and Part 3: the additive building is 22x70. The area in the middle with the large tank is 75 ft tall give or take a foot or two. Total general sq footage on 1st floor is 4800 sf. This building has steel lining outside and inside with insulation in gap. Includes ventilation fans, doors, trim around openings. Second level includes 45 degree stairway, deck, and control room. Very well built, solid building. See drawings in links for general arrangement and elevations. We have complete building drawings and foundations specifications for potential buyer.