Packaging & Manufacturing Consulting
Efficiency Capability, Productivity

Categories

Locations

View items per page
Sort by
Item cp142 - Boiler Controls
Manufacturer
Model

Boiler control panel with Allen Bradley panel view 1250 and panel view 1000

Place Holder
Item cp145 - Burner Management
Manufacturer
Model

Fluidized bed burner management and gas trains

Place Holder
Item 21-BN-110A - Burners Radiant Wall (36)
Manufacturer
Zeeco
Model
RWSF-4
Capacity
1

Zeeco radiant wall round flame burners, model RWSF-4. Shop order 17928. Fired with natural gas or syngas. Heat max per burner is 1.25 MMBTU, normal heat is 1.1 MMBTU. Gas line 3/4 inch, pilot line 1 inch. Physical size is approx 22" x 22" x 44" OAL. Lo-NOx, side fired. Stable flame over a wide range of conditions. Total Heat Load for all burners is 19.8 MM BTU/HR. Qty 36 - priced for all, includes removal and loading on your truck. NOTE: <Main photos show screw feeder still installed. It has now been removed and is in the laydown yard. See other photos>

Place Holder
Item 21-BN-132 - Burners Ultra Lo NOx (4)
Manufacturer
Zeeco
Model
GLSF-14

Zeeco round flame gas burners model GLSF-14 Free Jet Ultra Lo NOx - predicted 6 ppmv to 20 ppmv. Shop order 17928. Maximum heat per burner is 11 MMBTU, normal heat 9 MMBTU each. Operates on natural gas or syngas. Flame stable over a wide range of conditions - Turndown 10:1 or greater. Mounting options up-fired or side-fired. Max predicted flame 16.4 ft, max predicted width 2.5 ft. Total Heat duty for all 4: 44 MM BTU/Hr. Quantity (4) - priced for all, includes loading on your truck. Gas train skid available for these 4 burners - see item 21-BMR. NOTE: <Main photos show screw feeder still installed. It has now been removed and is in the laydown yard. See other photos>

Place Holder
Item 8135 - Combustor Roof - steel
Manufacturer
EPI
Model

Roof for EPI Combustor. New combustor roof with improved design - never installed (3 piles of steel) in yard. For EPI fluidized bed combustor 19' x 33' x 57ft tall.

Place Holder
Item 7176 - Deaerator
Manufacturer
PMI Industries
Model

Deaerator for water feed to steam system. Mfg by PMI Industries, made by Hall Tank. Spray tray design for 28,000 #/hr steam. ASME Nat'l Bd #95 MAWP 50 psi at 500F. Serial # 126-861. Size approx 3 ft 6 in dia x 10 ft s/s x 11 ft OAL x 8 ft 6 in OAH. Dry weight 3000 pounds. See multi-page drawing for more details

Place Holder
Item ME-13301 - Detroit Stokers
Manufacturer
Detroit Stoker Company
Model
27" Ultrafeed

Detroit Stokers. 27 inch underthrow, With freestanding coal feeder control panel (18 in. x 42 in. x 72 in. tall). Built 2006. Size of stoker approx 2.5 ft wide x 6'-5" tall. Feed hoppers with ultrasonic level control and Tramco drag conveyor are also available as optional cost - see Asset ME-13302 and CD-13814. With hopper is 5' wide at top x 18'-3" tall. Weight approx 18,500 pounds. Last used for coal. Quantity (3) - Priced separately

Place Holder
Item 6922 - Dowtherm Vaporizer
Manufacturer
First Thermal
Model
5 MMBTU
Capacity
5

IC First Thermal (Eclipse) Dowtherm firetube vaporizer, capacity 5 MMBTU at 135 psig. Burns natural gas, has 5 HP motor fan blower. Built in 1975, Serial number 44910, ASME Nat'l Bd# 41254. Repaired in 2004 by Industrial Boiler and Mechanical (Chattanooga). Physical size is approximately 6 ft dia x 12 ft long + blower section. Currently vaporizes Dowtherm but can be converted into a Thermal Fluid Heater for use with such oil heater products as food safe MobilTherm. The manufacturer is still in business and supports this vaporizer. Was in operation until February 2013. Removed and ready to load.

Place Holder
Item 7175 - Dowtherm Vaporizer
Manufacturer
First Thermal
Model
4 MMBTU
Capacity
4

First Thermal Dowtherm Vaporizer, capacity 4 MMBTU/hr output with 5.5 MMBTU input. Serial number 47351. Designed to burn #2 fuel oil or natural gas. Includes gas train and 1 fuel pump. Burner is by Tower Flame. Heat transfer area 787 sf, max temp design 650F. Size approx 67 in dia x 202 inch long. Dry weight 19,500 pounds. Removed - ready to load. See multi-page drawing for more details

Place Holder
Item cp153 - Economizer
Manufacturer
Rentech
Model

Rentech Boiler Economizer. Gas side designed for 304,613 lbs/hr at 425F. Steam side designed for 105,263 #/hr at 172 psig. Tubes 2", 120" m.w., SA178A material, tube arrangement, inline 12 streams, 1 inlet, 1 outlet. MAWP 250 psi at 500F (700F tubes). Size is 192 inch wide x 167 inch long x 76 inch tall (16 ft wide x 14 ft long x 6.3 ft tall). Dry weight 53,000 pounds.

Place Holder
Item cp144 - Feedwater & Softener System
Manufacturer
Model

Softener System - Deaerator & Tank system including (2) pumps LN 64, Grundfos designed for 350 gpm at 472 feed head, Driven by 60HP motor, 3500 rpm, 435 psi max, 356 F. For HRSG boiler and economizer

Place Holder
Item 7459 - Firetube Boiler
Manufacturer
Johnston
Model
750HP
Capacity
750

Johnston 750HP Firetube Boiler. Built in 1989. 4 pass wet-back with steam at 150psi. This boiler has an IC burner and runs on gas and #2 and #6 oil. Boiler is in good condition and so are the tubes. Price is " as is " and includes loading the boiler onto your truck. Boiler can be offered " reconditioned ". If interested, please inquire about additional reconditioned price.

Place Holder
Item 8096 - Firetube Boiler
Manufacturer
Johnston
Model

One (1) 1998 200 HP Johnston boiler, 4 pass wet back, gas and No. 2 oil fired, 250 PSI design pressure The boiler will be cleaned on the fireside, waterside, outside, and painted. The boiler pressure vessel, tubes, piping, and blowdown valves will be hydrostatically tested. The existing Honeywell 7800L Flame Safeguard Controls will be checked and replaced if found defective. New Honeywell High Limit with manual reset, Operating Limit, and Modulating Limit Controls will be installed. The boiler will be electrically and mechanically checked throughout to identify and replace any defective components. The combustion air fan will be run to check for balance and bearing smoothness. We guarantee that the pressure vessel and tubes are in good condition and that the boiler will pass a hydrostatic test at the time of startup. We will give a 1 year parts replacement warranty on controls. This quote is for the boiler only. No support equipment is included.

Place Holder
Item 7084 - Firetube Boiler
Manufacturer
Cleaver Brooks
Model
500 HP
Capacity
500

One (1) 1989 500 HP Cleaver Brooks boiler, 4 pass dry back, 150 PSI design pressure, No. 6 oil fired with a propane pilot. This boiler will be cleaned on the fireside, waterside, outside, hydrostatically tested, and painted. New waterside and fireside gaskets will be installed. A new Honeywell 7800L Flame Safeguard Control will be installed. New Honeywell High Limit with manual reset, Operating Limit, and Modulating Limit steam pressure controls will be installed. New control and electrical panels will be installed. The boiler will be completely re-wired for site voltage. The boiler will undergo a final mechanical and electrical check to insure all system are functional. We guarantee that the pressure vessel and tubes are in good condition and that the boiler will pass a hydrostatic test at the time of startup. New relief valves will be supplied shipped loose for field installation. We will give a 1 year parts replacement warranty on controls. The boiler will be wired for site voltage available. The boiler is quoted with on/off water level control. Price includes loading the boiler on your truck.

Place Holder
Item 8076 - Firetube Boiler
Manufacturer
Cleaver Brooks
Model
100 HP
Capacity
100

One (1) 1999 100 HP Cleaver Brooks boiler, 4 pass dry back, natural gas fired, 150 PSI design pressure. The boiler will be cleaned on the fireside, waterside, outside, and painted. The boiler pressure vessel, tubes, piping, trim piping, and blowdown valves will be hydrostatically tested. New fireside and waterside gaskets will be installed. The Honeywell 7800L Flame Safeguard Controls will be checked and replaced if found defective. New Honeywell High Limit with manual reset, Operating Limit, and Modulating Limit steam pressure controls will be installed. The boiler will be electrically and mechanically checked throughout to identify and replace any defective components. New relief valves ship loose for field installation. We will guarantee that the pressure vessel and tubes are in good condition and that the boiler will pass a hydrostatic test at the time of initial startup. We will give a 1 year parts replacement warranty on the controls. Price is based on the boiler being wired for 460/3/60 VAC power and "on/off" pump control for water level control. The price is for the boiler only. No support equipment is included. No steam outlet valves are included. I have the boiler feed system that came with these boilers. Subject to prior sale.

Place Holder
Item 7124 - Firetube Boiler
Manufacturer
Garioni
Model
Firetube
Capacity
300

Garioni firetube boiler 300HP. Type NG5000, serial 7118. Mfg by Garioni, Brescia, Italy. Capacity 5000 kg/hr (11,000 pph steam or about 300 HP at 12 barg max (180 psig). Firetube 2-pass dry back type boiler. Built in 2002 but only used about 6 months. Electrical for controls is 110V 60 Hz. Burner fires on #2 fuel oil - pumps not included. Will need new control panel. Sold As Is - price includes loading on your truck.

Place Holder
Item 5106 - Firetube Boiler
Manufacturer
Cleaver Brooks Boiler
Model
350HP firetube
Capacity
350

Cleaver Brooks firetube boiler 350HP. 4 pass dry-back - Built 1979, 150 PSI design pressure, gas fired. This boiler will be cleaned on the fireside, waterside, outside, and painted. The boiler pressure vessel, tubes, piping, and blowdown valves will be hydrostatically tested. New electrical and control panels will be installed. All new wiring will be installed. New Honeywell 7800L Flame Safeguard Controls, Honeywell High Limit with manual reset, Operating Limit, and Modulating Limit Controls will be installed. The boiler has been electrically and mechanically checked throughout to identify and replace any defective or obsolete components. We guarantee that the tubes pressure vessel are in good condition and that the boiler will pass a hydrostatic test at the time of startup. We will give a 1 year parts replacement warranty on new controls. Price includes loading the boiler on your truck.

Place Holder
Item 5339 - Firetube Boiler
Manufacturer
Donlee York
Model
300HP
Capacity
300

Donlee York 300HP Firetube Boiler. Model SPHV-300-N-200132. This boiler produces steam at 150psi and runs on natural gas. Boiler has been reconditioned. Price includes loading Year it was new: 2000, Rebuilt in 2014. Serial: 00-21032 H-14225. The boiler does not have a water makeup tank nor a softener. The unit has been rebuilt which includes: Hydro Test and wash out to remove scale from unit, Refractory in doors and burner throat inspected and repaired as needed, the pressure tools, fire side gaskets, and water side gaskets were replaced, boiler tubes were brushed, rebuilt wind box and installed new bearings, new mod motor for the blower, new chassis for the fireye flame safe, blowdown piping and valves replaced.

Place Holder
Item 7262 - Firetube Boiler
Manufacturer
Johnston
Model
500HP
Capacity
500

Johnston 500HP Firetube Boiler. Built in 1987. 4 pass wet-back, gas/ #2 oil fired with a Johnston burner, 200PSI design pressure. Price includes loading boiler on your truck.Reconditioned boiler will be cleaned on the fireside, waterside, outside, painted, and hydrostatically tested. The Flame Safeguard Controls will be upgraded to the Honeywell 7800L Series or equal. New steam pressure controls will be installed. Fuel trains will be inspected. All trim piping, blowdown piping, and blowdown valves will be inspected and replaced if found defective or unsatisfactory. The boiler will be mechanically and electrically checked throughout. Anything found to be defective will be replaced. A final simulated test fire will be performed on the boiler to insure that everything is functioning properly. We guarantee that the pressure vessel and tubes are in good condition and that the boiler will pass a hydrostatic test at startup. We will give a one year parts replacement warranty on the controls. Shipment: Normally 4 weeks after receipt of down payment, but this can vary depending on the boiler chosen and the shop load at the time an order is received. Boiler prices are based on "ON-OFF" feed water level controls and 480 volt, 3 phase, 60 hertz voltage. The prices are for the complete boiler only. No additional support equipment is included. No steam outlet valves are included. We can quoted additional equipment, as needed, upon your request. No taxes of any kind are included in the price. Any applicable taxes will be added to the above prices, or we must receive a tax exempt certificate from the purchaser.

Place Holder
Item cp150 - Fluidizer Bed
Manufacturer
Von Rol
Model

Large fluidized bed, fluidizer for corn syrup. Size approx. 40 ft dia x 60 ft tall. Has fire brick.

Place Holder
Item 8133 - Gas Train Manifold 1
Manufacturer
North American Mfg
Model

Fuel train, gas regulator and dual North American gas shut off valves for boiler burner feed. Complete packaged unit with control panel flame management system. Sized for 15 MMBTU. 2" gas piping. See drawing in link for all details and parts to this assembly. Approx. physical size 82" wide x 26 inches deep x 68 inches tall.

Place Holder
Item 8134 - Gas Train Manifold 2
Manufacturer
North American
Model

Fuel train, gas regulator and dual North American gas shut off valves for boiler burner feed. Complete packaged unit with control panel flame management system.

Place Holder
Item L219 - Gas Train Manifold 3
Manufacturer
Maxon
Model

Gas Train manifold - includes (2) Maxon valves, pressure transmitters

Place Holder
Item 5775 - Reboiler
Manufacturer
Model

Reboiler, 2 pass, 316 ss, H-1511A, S/N 02-3881A, 2002, 1884 sq ft, 34" I.D. X 16 ft. Shell 200 psi @ 400F. This has been repaired by Dewine Mechanical in 2011.

Place Holder
Item 5781 - Reboiler
Manufacturer
Mason Mfg
Model

Reboiler, 2 pass, 316 ss, H-1511B, S/N 02-3881B, 2002, 1884 sq ft, 34" I.D. X 16 ft. Shell 200 psi @ 400F. This has been repaired by Dewine Mechanical in 2011.

Place Holder